Decks .com - deck builders, contractors, plans, designs, materials. LOGIN
Contact Us

Foundations
Footing Inspections - Decks.com Concrete
Footing Inspections
Never pour concrete until after your footings have passed inspection. In order to pass your footing inspection you will need to have an inspector measure to verify that the holes base size and depth meet the specifications of the approved plans.  The holes must also be free of loose dirt and water.  If you have water in your holes you may try to pump the water out or allow them to dry out over a couple of days.  If you are not going to be able to attend the inspection you will need to post the inspection card and approved plans in an accessible place for the inspector to sign off on.  Once the holes have been signed off on you can get ready to finish building your footings.  Contractors can save a lot of time on a project by coordinating prompt footing inspections following excavations.

 
Sponsor Links

Fast & Proper Footing Forms

Cellular PVC Vinyl Decking

Maintenance free Exterior Flooring

Siberian Larch

Stainless Steel Cable Deck Railing

Thermally Modified Wood Decking

Build a Safe, Strong Deck

Deck Screws: No Splits, No Predrilling

Stone Tile Pavers Outdoor Flooring

Deck Railing

Wolmanized® Outdoor® Wood

Deck Cleaner - Brightener- Stripper

Home | Deck Photos | Discussions | Login | Industry Links
Affiliates:bird breeders
Copyright © 2000 - 2009, Decks.com. All rights reserved. Terms of Use - Policies