How do I replace all five Posts on a 2Story Deck?
Decks .com - deck builders, contractors, plans, designs, materials. LOGIN
Contact Us

Home » Public Forum » Ask The Deck Experts » How do I replace all five Posts on a 2Story...
 


How do I replace all five Posts on a 2Story... Expand / Collapse
Message
Posted 7/6/2006 10:36:13 PM Post #1839
 

Forum NewbieForum NewbieForum NewbieForum NewbieForum NewbieForum NewbieForum NewbieForum Newbie

I recently have uncovered that the previous owner had built an unsecured second story deck.  The ledger board was only nailed to the house in six spots and the 4X4 posts were set in dirt on a very small amount of concrete.  I have since lag bolted the ledger board to the house with the help of some friends and a pickup truck; however, I am not sure the best course of action regarding the posts and could use some advice. 

The deck is an "L" shape with a small 8'X10' section on one side and a larger 26'X15' section on the other.  Again the ledger board has been lag bolted to the house, decking sits on 2X10X14, with a double 2X10 beam running the 26' length at approx. 12' from the house leaving a 2' cantilever.  The beam again sits on 4X4 posts that are resting directly in the dirt on no real footers to speak of. 

First, It is my intention to replace these 4X4 with 6X6 for added stability, from what I have read from all of the other post, my joist span should be acceptable with just the one beam at 12 feet? 

Secondly, I have already placed screw jacks to hold the deck while I have begun to dig out the holes for footers and remove little concrete in place. However, I have read conflicting reports on setting the post 12-24" in the concrete and am looking for some guidance.  My plan (please correct me if it is wrong) is with the deck jacked up, remove the 4X4, dig down to the proper depth, tube and gravel, and place the new-notched 6X6 in the existing space, and concrete.  To me this seems a little less precise than working off a new footer pier and match and existing beam?!?! 

I appreciate your time and any input you might provide, this has been a nightmare!  Thanks in advance

Brian F.
Posted 7/8/2006 12:19:31 AM Post #1847
 

Supreme BeingSupreme BeingSupreme BeingSupreme BeingSupreme BeingSupreme BeingSupreme BeingSupreme Being
Hi Brian, thanks for your post. Everything you mentioned looks good except for setting the new posts. I would pour footings to project above grade by a few inches. The depth and diameter of the piers should be per your local codes.

Let the concrete piers set and place the 6x6 posts on the piers in post brackets. This way the posts remain out of the ground and possible rotting issues will be prevented.

Thanks 

Anderson Pro Carpentry

Posted 7/9/2006 8:13:34 PM Post #1862
 

Supreme BeingSupreme BeingSupreme BeingSupreme BeingSupreme BeingSupreme BeingSupreme BeingSupreme Being
Ken,

I would rest the deck on temps. Remove the old 4x4's and beam. Install a new beam 2/2x10 (let it hang on 2x2 on both sides) Dig your holes to the required depth. Notched your 6x6 and cut them to length minus 8" for your footing. Bolt these post with two 1/2" carriage bolts. Pour your footing and remove the temps the next day.

Clemens

« Prev Topic | Next Topic »


All times are GMT -5:00, Time now is 5:56pm

Powered By InstantForum.NET v4.1.2 © 2009
Execution: 0.094. 10 queries. Compression Disabled.
Sponsor Links

Composite Decking

Deck Foundation System

Maintenance free Exterior Flooring

Post Caps

Keep It Dry Under Your Deck

Deck Lighting - Deck Balusters - Post Caps ...

Stainless Steel Cable Deck Railing

Deck Railings

Deck Screws: No Splits, No Predrilling

Quick & EZ Footing Forms

Wolmanized® Outdoor® Wood

Post Footings Eliminates Concrete

Home | Deck Photos | Discussions | Login | Industry Links
Affiliates:bird breeders
Copyright © 2000 - 2009, Decks.com. All rights reserved. Terms of Use - Policies